Uniquely designed and strategically located ThaneOne Business Park is a corporate real estate with iconic office space. It is spread over 6 acres in Thane and built to LEED Platinum standards. Designed by Bentel Associates Realty Design Consultants, ThaneOne has bagged the coveted “Best Office Architecture 2013” recognition at the Asia Pacific Property Awards, Malaysia.

The project features high speed elevators, 24-hour facility management, next-generation energy efficiency standards, Seismic Zone 3 earthquake resistance and it is designed along the proven intricacies and fundamentals of Vastu. ThaneOne prides in itself with unparalleled benefits of structural elegance, high level of security, all-encompassing amenities and seamless connectivity that add to its 360 degree appeal. Besides the top-notch features, its design incorporates lush green terrace gardens, water bodies, green zones to offer an unmatched balance of productivity and tranquillity to corporate executives.

The project is structured to impress with a grand double height entrance lobby. Floor to ceiling height is of minimum 12 feet with 8 meter minimum column to column distance on one grid. With Integrated Building Management system, the project ensures efficient monitoring, operations and control of security systems, air-conditioning & ventilation systems, smart card reader access and intruder alarm system.

Energy efficient to the core and built to LEED Platinum status, the project is installed with energy efficient high-side air conditioning, and smart lighting. To reduce energy consumption, solar panels are installed to produce renewable energy. Glazed glass façade helps reflect heat and uses less energy for cooling.

QUICK FACTS

Project: ThaneOne
Location: Thane (West), Off Eastern Express Highway
Client: DIL Ltd.
Architect: M/s Scapes
Design Consultant: Bentel Associates Realty Design Consultants Pvt Ltd.
Other Consultants: Shilp Consulting Engineers, S N Joshi Consultants Pvt. Ltd. , Ab Initio, Langdon & Seah Consulting India Pvt Ltd, Pioneer Property Zone, Prem Associates.

Materials used for façade: Strip glazing, structural glazing, vertical green wall, texture paint.

Area: ~ 200,000 sq. ft
Commencement Date: Foundation day November 5th 2012
Completion Date: December 2015.

 

Thaneone business park
Thaneone business park
Interior of thaneone business park

Related Post